Most remodelers make you ask for a number. We think that's backwards. Below are real ranges from real GoLoudon projects, the factors that move a budget up or down, and a short project form that helps us prepare for a first conversation.

Typical ranges for finished, permitted North Dallas projects — not a starting-at number. The wider the bar, the more scope and finish level can move the total.
Larger scopes and premium finishes run higher than the typical ranges above. The projects below are real GoLoudon work; individual project costs vary with scope, finishes and existing conditions.
The single biggest swing factor is finish level. Stock cabinetry and a quartz counter price very differently than inset custom millwork and book-matched stone — same footprint, meaningfully different budget.
Scope is the second lever. A cosmetic refresh — new surfaces, fixtures, and paint inside the existing walls — costs far less than a full gut that moves plumbing, electrical, or a load-bearing wall. We flag structural unknowns during preconstruction, before a price is fixed, so they don't surface as a change order later.
Site conditions and design complexity close the gap. Older North Dallas homes can hide wiring, framing, or foundation surprises that a newer build won't have, and a highly custom architectural design simply takes more hours to build than a straightforward layout.

Kitchen remodel: new cabinetry, counters, and finishes throughout.

Primary suite remodel: new bath and bedroom finishes.

Full interior renovation.
Completed GoLoudon kitchen remodels range from about $40,000 to $100,000, depending on scope and finish level. A cosmetic refresh sits at the lower end; a kitchen with a reconfigured layout, opened walls and custom cabinetry sits at the higher end.
Initial conversations and ballpark ranges are free. For a firm, itemized number, we start with a paid preconstruction agreement that covers detailed drawings, selections, and a fixed-price proposal — standard on projects over $150,000.
A single-room remodel typically runs 8 to 14 weeks once construction starts; a whole-home renovation or addition runs 4 to 9 months. Preconstruction — design, permitting, selections — happens before that clock starts.
Yes. GoLoudon LLC is an insured general contractor. Gregory Loudon holds CGR (Certified Graduate Remodeler), CAPS (Certified Aging-in-Place Specialist), and CGP (Certified Green Professional) designations.
Three things move the number most: finish level, scope, and site conditions — older homes and additions cost more to open up than a straightforward refresh.
We work with homeowners across North Dallas and Plano to plan and execute well-managed remodeling projects with clear expectations and proven outcomes.